News
  June 2010
Read about the San Vincente Low Level Outlet Cofferdam, Cresent City Tsunami Study, and Finite Element SSI Analyses of IHNC Floodwall
Published:11/1/2009
 
feb2009   November 2009
Read about Costa Azul LNG Terminal Caisson Breakwater in Baja California, the Containment of LNG within Cryogenic Conrete Containment Tanks (C3T); our work with the United States Navy; and Olmsted Dam project.
Published:11/1/2009
 
jul2007   February 2009
Read about Inner Harbor Navigation Canal Hurricane Protection Project, Locks of the La Ville Contemporaine Lagoons in Dubai, UAE and MOTEMS High Risk Audits.

Published:02/1/2009
 
dec2006   July 2007
Read about composite concrete cryogenic tank study, forensic engineering of marine and foundation structure and new publications
Published:07/1/2007
nov05   December 2006
Read about Steel form for casting the nested foundations, offshore windmill foundations, offshore tidal, wave and current energy structures, Hydraulic, Coastal, and Marine Engineering, Geotechnical Analysis and Design, Structural Design from Project Definition through Construction Administration, Value Engineering, Construction Engineering and Methods, Cost Estimating
Published:12/1/2006 read the news >>
  see more Gerwick News >>
 

Projects keyword search

Date:

 
2009 Catalog
June 2010 Newsletter
 
locations
Project Locations
 
 
 

cowi

 

BT

 

occ

 

Copyright MMX- Ben C. Gerwick, Inc. - 1300 Clay St., 7th Flr. Oakland CA. 94612
tel. 510-839-8972 | fax 510-839-9715 | e-mail: info@gerwick.com